McLaren Greater Lansing selected Granger Construction as their Construction Manager for construction of their Medical Services Building and Cancer Center, which will be connected to their new hospital. Work began on this Design-Assist project in March 2020, with anticipated completion …

Read More

Granger Construction was selected as the Construction Management partner by the State of Michigan Department of Technology, Management and Budget (DTMB) and the Department of Health and Human Services to construct a new 100-bed psychiatric hospital in Caro, Michigan. Project …

Read More

St. Joseph Mercy Oakland chose Granger Construction to manage the remodeling of two
separate and consecutive pharmacy projects to meet new USP 800 requirements. The outpatient pharmacy project, located in the out-patient services building directly above the
outpatient surgery center, involved remodeling the existing Cancer Center waiting room and pharmacy to create a larger area for the pharmacy. The in-patient pharmacy project is located in the lower level of the main hospital. Both projects include clean/sterile rooms and improved ventilation to meet new codes. Granger also installed a new air handling unit in the existing penthouse to support both pharmacy renovation projects.

Continue reading St. Joseph Mercy Oakland Pharmacy Renovations

Granger Construction provided design-build services to Metropolitan Detroit Area Hospital Services (MDAHS) for a new medical laundry facility. MDAHS is a joint venture is between Henry Ford Health System, Michigan Medicine and St. Joseph Mercy Health System. About the Project …

Read More

In 2016, Granger Construction began major renovations for Sparrow Health System at their Sparrow 5 Foster Pediatric Unit in Lansing, Michigan.

During a finish upgrade project, Sparrow Hospital found mold behind existing vinyl wall covering on the 5 Foster Pediatric floor. Further investigation found this was a floor-wide issue. Due to past successes on the 8 South Renovation and 6 Foster (Mary Free Bed) Renovation, Sparrow bypassed bidding and contracted directly with Granger to renovate the floor.

Continue reading Sparrow 5 Foster Pediatric Renovation

In June of 2019, Granger Construction began work as the Construction Management partner for the Spectrum Health 4600 Breton Renovation project in Grand Rapids, Michigan. In addition to serving as CM, Granger self-performed demolition and carpentry work. This was a …

Read More

In November of 2018, Granger Construction completed major addition and renovation work at St. Joseph Mercy Health System Cancer Center in Ann Arbor, Michigan.

This project involved the expansion and full renovation of the Cancer Center on the SJM Ann Arbor campus, originally built in 1993. The existing two-story building was originally a business occupancy space with basement storage and utility area, adjacent to the hospital’s Radiation Oncology department.

A two-story addition was constructed toward the parking lot, adding approximately 12,000 SF of new floor area to the facility. The project will also provide approx. 9,300 SF of new support areas within the existing footprint of the lower level.

Continue reading St. Joseph Mercy Health System Cancer Center

In March of 1996, Granger Construction completed the Lansing Surgery Center, the first freestanding, physician-owned, ambulatory surgery center in the state of Michigan. This facility features: Four operating rooms Five preparatory and recovery areas Endoscopy area Locker room facilities Administrative …

Read More